Energy | Electricity | Technical Report
INTERRFACE project : review of D2.4 regulatory framework
09 October 2019
A multitude of articles in the Clean Energy Package (CEP) Directive on common rules for the internal market for electricity (e-Directive) guide Member States (MS) to innovate in new domains related to the electricity system.2 In short, these articles set principles lining out the boundaries for the implementation of national regulatory frameworks. At the same time, these same new domains fall within the scope of network code areas identified in the CEP Regulation on the internal market for electricity (e-Regulation).3 More precisely, in Art. 59 of the e-Regulation areas are described for which binding Commission Regulations can be developed. Some of the network code areas in Art. 59 were already described in the Third Energy Package, which preceded the CEP, and lay at the basis of eight network codes and guidelines which are currently in force. The new e-Regulation added some new network code areas and amended some existing ones. The general idea is that innovation with regulation at MS-level, triggered by the e-Directive, can in the longer term serve for inspiration for new network codes or guidelines at EU-level or for amendments of existing ones.
logo cadmus Read it on Cadmus Download in open access

LATEST FSR PUBLICATIONS

Other
In 2022, we experienced an unprecedented energy crisis. Governments intervened to help consumers pay their bills and to apply revenue claw-back mechanisms on utilities. ACER identified a total of 400 [...]
Other
If estimates and targets are to be believed, roughly 6 to 10 million tonnes of hydrogen will be imported into the EU every year by the end of the decade, [...]
Other
The Performance Review Commission (PRC) is an independent body supported by EUROCONTROL with a remit to review and report on the performance of European air traffic management (ATM). While performance [...]
Technical Report
As stated by the OECD, “water security in many regions will continue to deteriorate due to increasing water demand, water stress and water pollution.” Indeed water supply and sanitation (WSS) [...]
Other
Electricity is used for railway traction. With the 4th Railway Package, traction current became excluded from the Minimum Access Package to be provided by the Infrastructure Managers (IMs) and was [...]