Loading Events
  • This event has passed.

The SmartNet project is going to complete its activities within the current year. We have always paid a great attention to collect feedbacks and suggestions from the stakeholders’ world and now, six months ahead to the end of the project, on July 20th we are going to organise a full day workshop in Brussels.

The aim of this Workshop is to provide a detailed dissemination of the results obtained and lessons learned, both from the simulation and cost-benefit analysis on the different coordination schemes, and from the three technological pilots on the three countries (Italy, Denmark and Spain). However, this will also constitute the last opportunity to collect a comprehensive feedback from the stakeholders, which will help us to elaborate the final recommendations and regulatory guidelines.

The location in Brussels should be the most favourable one to collect the most important European stakeholders, representing the manifold viewpoints of the electricity world. A world which is in quick evolution and thus is very interested in a prospect view showing how the system should evolve in the mid-term as far as TSO-DSO interaction is concerned.

 

Register here

 

Date: 20 June 2018

Time: 9:00 am – 16.30 pm CEST

Location: VLEVA office: Kortenberglaan 71, 1000 Brussels

Programme:

  • Introduction to the SmartNet project (G. Migliavacca – RSE) – 15 minutes
  • Five TSO-DSO coordination schemes (H. Gerard – VITO) – 20 minutes
  • Real-time market architecture issues (G. Leclerq – N-SIDE) – 20 minutes
  • Aggregation models (M. Dzamarija – DTU) – 20 minutes
  • The three national simulation scenarios (H. Svendsen – SINTEF) – 20 minutes
  • Simulation platform and simulation results (M. Rossi – RSE) – 40 minutes
  • Cost-benefit analysis methodology (C. Madina – TECNALIA) – 40 minutes
  • Regulatory analysis (I. Kockar – Strathclyde University) – 20 minutes
  • Introduction to the three technological project pilots (C. Madina – TECNALIA) – 15 minutes
  • Demo Italian Pilot (L. Ortolano – TERNA) – 30 minutes
  • Demo Danish Pilot (H. Madsen – DTU) – 30 minutes
  • Demo Spanish Pilot (M. Pardo – ENDESA) – 30 minutes
  • Debate with the European stakeholders: ideas suggestions in sight of project finalisation – 1 hour
Logistics
Daniela Bernardo
Venue
Brussels
Rue Wiertz, 60
Brussels, Brussels 1047 Belgium

+ Google Map

RELATED EVENTS

Regulatory responsibility and the duty of care in realising the energy transition
Regulatory responsibility and the duty of care in realising the energy transition

FSR Debates series Based on an unwritten duty of care in Dutch tort law, a Dutch Court  has in May…

Electric vehicles diffusion challenges
Electric vehicles diffusion challenges

Since the last 3 years, Electric vehicles are booming around the world. In France 16% of the cars sold are…

FSR Climate Annual Conference 2021
FSR Climate Annual Conference 2021

FSR Climate is pleased to announce its 7th Annual Conference on the Economic Assessment of European Climate Policies to take place…

Join our community

To meet, discuss and learn in the channel that suits you best.

scroll

top